Engineering

of equipment

for gas and petrochemical industries

Procurement

processing equipment

and installations of factory readiness

Construction

installation and commissioning

supervision of the project

Engineering

Engineering

Designing systems for gas and petrochemical industries

more
Procurement

Procurement

Procurement and delivery of processing equipment and installations of factory readiness

more
Construction

Construction

Installation and commissioning Reconstruction and capital repairs Work on protection of designs

more
line
All-metal filter elements production
All-metal filter elements production
15.05.2017
Start of the filter elements production
Start of the filter elements production
21.12.2016
Filter mesh DN300
Filter mesh DN300
08.09.2016
Devices for chemically contaminated water cleaning unit
Devices for chemically contaminated water cleaning unit
17.06.2016
compressor unit
The compressor unit 4ГУ2-3/6-35С У1
08.06.2016
Сертификация импортной продукции Certification of imported products
Vessel Е-4,Е-6
Vessel Е-4,Е-6
Deaerator K-207
Deaerator K-207
Pre-treatment reactor R-01
Pre-treatment reactor R-01
Hot Low Pressure Separator C-03
Hot Low Pressure Separator C-03
Condensate stripper K-101
Condensate stripper K-101
Stripper K-02
Stripper K-02